Sriracha Harbour
Public Company Limited

  •   关于我们  
    • 25 Years Experience
    • SRH Milestone
    • Board Management
    • Organization Chart
    • Award & Certification
  • 设施
    • Port Services
    • Berth Facility
    • Facilities On Shore
  •   服务  
    • PORT SERVICES
    • Storage Services
    • Other Services
    • Carrier regularly
  •   服务费  
    • DEFINITION
    • SECTION I
    • SECTION II
    • SECTION III
    • SECTION IV
  •   在线服务  
    • Check Price
    • บริการข้อมูลการขนถ่ายสินค้า
    • Download
    • Mail Online
    • CCTV Online
    • แบบสำรวจ COVID-19
  •   综合新闻  
    • News & CSR
  •   联系我们  
    • Contact
    • Career
    • ประกาศรับสมัครงาน
中国
  • TH
  • EN
  • 中国
MENU

SRH
TARIFF

  • DEFINITION
  • SECTION I
  • SECTION II
  • SECTION III
  • SECTION IV
Definition Means
1. Employee Sriracha Harbour Public Company Ltd. employee.
2. Port Sriracha Harbour (SRH).
3. Day Period of time starting from 00:00 hour until 24:00 hours of each day unless specified otherwise.
4. Month Calendar. month starting from the 1st. day of the month until the end of each month.
5. Vessel Cargo vessel or other sea going vessel unless specified otherwise.
6. Idle Vessel Vessel under repair, taking bunker or provision and not intend to perform cargo operation including vessel completed cargo operation except for vessel waiting for cargo operation.  
7. Vessel Under Repair Vessel which is required for immobilize or to do hot work and must obtain permission from SRH and comply with Item 412.
8. GRT (GROSS REGISTERED TONNAGE) Gross registered tonnage of vessel or barge which has been registered at the   original port of registration.
 
9. TONNE Revenue tonne which is equal to the bigger figure of the weight in metric tonne and of the volume in cubic meter.  Revenue tonne is the basis for calculating the port charges.
10. Port Area The area as specified in the Royal Decree defining the limits of Harbour Department jurisdictional area at Sriracha Harbour (SRH). 
11. Berthing Area SRH Multi-purpose berth under supervision of SRH.
12. Custom Area Specified custom area at Berth.
13. Consignee or Consignor Owner of import or export cargo or other person who is in charge of  that cargo for any period of time since receiving from or delivery to Shipowner or its Agent.
14. Storage Area Area for storing cargo on open yard or inside warehouse within Customs Area.
15. Valuable Cargo Any cargo with a value per package, per piece, per one cubic meter or per 250 kilograms of  more than 25,000 Baht and of which the owner intends to hold the Port responsible for the value of that cargo by notifying  the Port in writing  before receiveing the cargo into the Port.   
16. FCL (FULL CONTAINER LOAD) Loaded container which is not stuffed or unstuffed inside the Custom area.
17. LCL (LESS THAN CONTAINER LOAD) Loaded container which is stuffed or unstuffed inside the Custom area.
18. Oversized Container (OVERHEIGHT / OVERWIDTH / OVERLENGTH CONTAINER) A container that contains cargo beyond the limits of its size.




 
19. Through Cargo or Shifting Container Cargo or container that has origin and destinatinstion at another port and has been unloaded on to the terminal or barge at the Berth and has been loaded back to the same vessel for  transportation to the destination port. Through cargo includes the equipments of the vessel, hatch covers, etc...brought on to the terminal. Such cargo or container shall not be handled in any way but temporary storage on the terminal.  
20. Transhipment Cargo or Transhipment Container Cargo or container that has the same handing as Through Cargo or Shifting Container but has been loaded back to another vessel at SRH port. 

 
21. Dangerous cargo Dangerous cargo specified by International Maritime Organization or IMO.
 
22. Special cargo Cargo that weight is over 30 tons and/or the length is over 12 metres and /or  width more than 2.5 metres  and/or height  more than 3.0 metres, the cargo has to be handled by consignee or shipper.   
23. In calculating the port charges, service charges, and other fees that are charged per tonne, per day or per hour, any fraction of tonne, day or hour shall be counted respectively as 1 day or 1 hour unless specified otherwise.
24. All port charges exclude VAT.

CHARGE AGAINST SHIP'S OWNER OR SHIP'S AGENTS

101 CONSERVANCY DUES
Baht/GRT
Provision of safe navigation area at harbour front, available dept and other facilities  
including cost for line handling services to form berth for vessels large than 750 GRT.  
101.1 Vessel from 750 GRT 7
102 TUG SERVICE
Baht/Tug/Time
Use of tug boat for servicing vessel. Charge are made per hours used basis.  
102.1 Tug service 40,000
103 BERTH HIRE
Baht/100GRT/Hour
Use of berth for vessel. Charges are made according to vessel size and time basis.  
103.1 Berth hire for cargo or passenger vessel 10
103.2 Berth hire for idle vessels: Chage will be as per Item 103.1 for first 7 days berthing period commencing from the day completed alongside or completed discharging. Berth hire after first 7 days period will be 2 times from Item 103.1  
104 BERTH HIRE OF OTHER CRAFT
Baht/GRT/Day
104.1 At berth or beside vessel at berth 1
104.2 Minimum rate for berth hire of other craft 1,000
105 GENERAL CARGO WHARFAGE
Baht/Tonne
Charge are based on amount of cargo as follows:  
105.1 Import cargo 45
105.2 Export Cargo 40
106 GARBAGE CHARGE
Baht/Vsl/Day
Garbage shall apply for the vessel of more than 750 GRT. Charges are calculated per day commencing from the hour of berthing. 500
107 LABOUR STAND BY CHARGE
Baht/event
Charge for waiting time in case of Ship's owner of Agent gave notice for loading/unloading general cargo or containers and operation can not be continued for more than 1 hour for any reason and which is not the responsibility of the port. 2,000
108 PASSENGER FEE Baht/Person/Passage
Fee for passenger entering or leaving at berthing area. 30
109 QUAY CLEANING CHARGE Baht/Vsl/Day
Charges for cleaning berth which are claculated per day commencing from hour of berthing and apply for vessel more than 750 GRT. 500

CHARGES AGAINST CONSIGNESS OR CONSIGNORS

201 WHARF HANDLING CHARGE                                       
 
For handling of import cargo and loose LCL cargo at storage area to distribute to consignee at the place or for handling of export general cargo through custom area both by land or water to storage area for loading to vessel charge are as follows.
Baht/Tonne
 
201.1 Import cargo
  45  
  201.2 Export cargo   39  
         
202 ADDITIONAL WHARF HANDLING CHARGES   Baht/Tonne  
  202.1 Import cargo   26 
     202.2 Export cargo   26 
     
203 EXTRA LABOUR CHARGE Baht/Tonne
  For use of area and labour to handle cargo but other than wharf handling charge as specified in Item No.201 and 202. Additional charges are 15
     
204 CARGO STORAGE Baht/Tonne/Day
 
*** Free Time 3 Days (Import-Export)***
Storage Period (Day)
  204.1 Import cargo 1-7 8-14 15/Over
            204.1.1 General cargo 5 10 15
            204.1.2 Vehicle (unpacked) 10 20 30
            204.1.3 Dangerous cargo 15 30 40
         
  204.2 Valuable cargo      
         
  204.3 Auction cargo      
 
 
 
  204.4 Export cargo   Baht/Tonne/Day  
       5  

CONTAINER CHARGES, CHARGE AGAINST CONTAINER OPERATORS

Container charges are charges additional to charges specified in Section 1 and 2 for the use of services and facilities. Charges are based on the size in length of container regardless of volume or weight of cargo.

 
301 CONTAINER STEVEDORAGE      
 
 
Baht/Box/Movement
 
For Arranging container on vessel, Hatch opening and closing, lashing and unlashing and including the use of Port's crane or crane on vessel or barge or barge or coastal vessel for loading/unloading of container at Berth. Charge per movement are as follows:
20' 40' Over 40'
  301.1 Port crane (Gross weight spreader not over 25 MT.) 750 1,300 1,550
  301.2 Crane on vessel 450 800 950
  301.3 Crane on Barge or coastal vessel 150 300 350
302 CONTAINER WHARFAGE      
  Use of Berthing Area and handling equipment in moving container to/from Vessel, procedures are as follows:      
 
302.1 Inward Container
Baht/Box
 
     302.1.1 At berth to yard
20' 40' Over 40'
              302.1.1.1 FCL 1,100 1,600 1,700
              302.1.1.2 LCL 2,700 4,400 4,700
              302.1.1.3 Empty container 350 550 600
 
302.2 Outward container
Baht/Box
 
     302.2.1 At berth from yard
20' 40' Over 40'
              302.2.1.1 FCL 800 1,200 1,300
              302.2.1.2 LCL 2,200 3,500 3,800
              302.2.1.3 Empty container 350 550 600
303 CHANGE OF CONTAINER STATUS CHARGE  
 
Addition charges to inward container wharfage item No.302.1 are as follows:
Baht/Box
  303.1 Size-20'   300  
  303.2 Size-40'   450  
  303.3 Size-Over 40'   500  
304 SHUT-OUT-CONTAINER CHARGE  
 
Additional charge are as follows:
Baht/Box
  304.1 Size-20'   300  
  304.2 Size-40'   450  
  304.3 Size-Over 40'   500  
305 SHIFTING OR TRANSSHIPMENT CONTAINER CHARGE  
 
Charge are collected when discharged or loaded as follows:
Baht/Box
  305.1 Onberth or vehicle 20' 40' Over 40'
       305.1.1 Loaded container 500 800 850
       305.1.2 Empty container 250 400 450
  305.2 On Barge      
       305.2.1 Loaded container 350 500 550
       305.2.2 Empty container 200 300 320
306 LIFT ON / LIFT OFF CHARGES  
 
306.1 Lift on charges for Inward container
Baht/Box
       306.1.1 Bring out of custom area 20' 40' Over 40'
              306.1.1.1 FCL 670 1,000 1,070
              306.1.1.2 Empty container 240 360 380
  306.2 Lift off charge for Outward container      
       306.2.1 Bring into custom area      
              306.2.1.1 FCL 500 750 800
              360.2.1.2 Empty conrainer 240 360 380
307 RE-LOCATION CHARGE  
 
Additional charges are as follws:
Baht/Box
  307.1 Size-20'   300  
  307.2 Size-40'   510  
  307.3 Size-Over 40'   600  
308 EXTRA CONTAINER MOVEMENT CHARGES Baht/Box/Movement
 
For moving container on request of Ship's owner or Agent. Charges are as follows:
20' 40' Over 40'
  308.1 Within the same bay 300 510 600
  308.2 From one bay to another 830 1,250 1,430
309 CONTAINER STORAGE 
*** Free Time 3 Days (Import-Export)***
Baht/Box/Day
 
309.1 Inward container
Storage Period (Day)
       309.1.1 FCL or LCL 1-7 8-14 15/Over 
              309.1.1.1 Size-20' 125 250 400
              309.1.1.2 Size-40' 250 500 800
              309.1.1.3 Size-Over 40' 300 600 950
       309.1.2 Empty container Baht/Box/Day
              309.1.2.1 Size-20'   25  
              309.1.2.2 Size 40'   50  
              309.1.2.3 Size-Over 40'   60  
  309.2 Outward container      
       309.2.1 FCL or Empty container      
  See more detail      
       309.2.2 LCL      
  See more detail      
310 CONTAINER WEIGHING SERVICE  
 
Use of container weighing equiment. Charges are as follows:
Baht/Box/Weighing
  310.1 Size-20'   30  
  310.2 Size-40'   40  
  310.3 Size-Over 40'   50  

EQUIPMENT HIRE AND ADMISSION FEE INSIDE SRIRACHA HARBOUR

401 RAIL MOUNTED SHIP/SHORE CRANE 25 MT.  
 
401.1 Hire of service charge
Baht/Hour
 
General cargo (Cargo weight not more than 25 MT.) 
5,000
402 ADMISSION FEE FOR VEHICLES AND EQUIPMENTS  
 
402.1 Gate entry admission fee
 
 
Charge for bringing vehicles and equipment into custom area by land
Baht/Unit/Trip
       402.1.1 Truck 10 wheels and less 30
       402.1.2 Truck more than 10 wheels 100
       402.1.3 Tractor head 50
       402.1.4 Trailer with tractor head 100
       402.1.5 Fork lift truck 100
       402.1.6 Top-Loader, Reach Stacker 200
       402.1.7 Mobile crane-capacity less than 100 Tonnes 300
       402.1.8 Mobile crane-capacity 100-200 Tonnes 400
       402.1.9 Mobile crane-capacity 200-300 Tonnes 500
       402.1.10 Mobile crane-capacity over300 Tonnes 600
       402.1.11 Passenger Coach 100
       402.1.12 Passenger Van 50
       402.1.13 Passenger Car 30
       402.1.14 Excavator 100
       402.1.15 Bulldozer 100
       402.1.16 Pay Loader 100
       402.1.17 Lowbase trailer more than 2 axles 130/Axle
  402.2 Vehicle and equipment in custom area  
  charge for vehicles and cargo handling equipment kept into custom area more than 24 hours since the time of its entry Baht/Unit/Day
       402.2.1 Truck 10 wheels or less 200
       402.2.2 Truck more than 10 wheels 250
       402.2.3 Tractor head 100
       402.2.4 Trailer 6 wheels and less 100
       402.2.5 Trailer 8 wheels or 10 wheels 200
       402.2.6 Trailer more tha 10 wheels 250
       402.2.7 Forklift Truck 200
       402.2.8 Top Loader, Reach Stacker 300
       402.2.9 Mobile crane-capacity less than 100 Tonnes 500
       402.2.10 Mobile crane-capacity 100-200 Tonnes 600
       402.2.11 Mobile crane-capacity 200-300 Tonnes 700
       402.2.12 Mobile crane-capacity over 300 Tonnes 800
403 FLOATING CRANE FEE Baht/Hour
 
For loading or unloading cargo using private floating crane within the SRH port area.
1,000
404 HIRE OF SERVICE BOAT Baht/Hour
 
Hire of service boat
5,000
405 WEIGHING SERVICE Baht/Vehicle/Trip
 
Use of cargo weighing equipment. Charge are:
30
406 MOBILE CRANE (capacity 45 MT.) Baht/Unit/Hour
 
406.1 For working inside harbour area.(Minimum charge 4 hours)
2,500
407 FORK LIFT TRUCK Baht/Unit/Hour
 
407.1 Capacity 3 Tonnes
400
  407.2 Capacity 5 Tonnes 600
  407.3 Capacity 7 Tonnes 750
  407.4 Capacity 10 Tonnes 1,000
  407.5 Capacity 23 Tonnes 2,500
  (1 hours minimum charge for forklift all capacities)  
     
     

Sriracha Harbour
Public Company Limited

Port Office : 31/4 moo 4, Surasak, Sriracha, Chonburi 20110
Tel : +66(0) 038-773-069-76, 038-773-76, 038-773-078-81
Bangkok Office : 17th FL., U.M. Tower, 9 Ramkhamhaeng Rd., Suanluang, Suanluang, Bangkok 10250
Tel : 662-719-9631-6 Fax : 662-719-9629